Periodic Pavement

State Level

State Consolidation

Consolidated Cost
RM 97.39j
6 work items
Total Length
17.90 km
All districts
District Files In
2
1 still in draft
State APJ
APJN-2026-SEL
Selangor · Year 2026

Incoming District Submissions

Auto-listed · no manual entry
DISTRICT APJ FILE ITEMS LENGTH ESTIMATED COST SUBMITTED STATUS
Hulu Selangor APJ-2026-HLS 3 8.40 km RM 36,120,000 2026-02-05 Submitted to State
Sepang APJ-2026-SPG 3 9.50 km RM 61,275,000 2026-02-04 Submitted to State
TOTAL · 2 files 6 17.90 km RM 97,395,000

Awaiting submission: Klang — still in draft at district level, so not included in the consolidation.

Consolidated by State

BORANG ANGGARAN PENYENGGARAAN JALAN (BORANG APJ)

PROGRAM PENYENGGARAAN JALAN PERSEKUTUAN · TAHUN: 2026

NEGERI: Selangor PERINGKAT: NEGERI (Consolidated) RUJUKAN: APJN-2026-SEL
BIL KOD DAERAH NAMA LALUAN NO. LALUAN DARI KE PANJANG LOKASI PERIHAL KERJA KOS ANGGARAN KONTRAKTOR STATUS
1 BP07 Hulu Selangor Kajang – Seremban FT0001 83.50 85.10 1.60 R Rigid Pavement Repair (FRC) — 36% cracking · 18mm rut · IRI 5.9 RM 6,880,000 PROPEL Berhad P
2 BP07 Hulu Selangor Kajang – Seremban FT0001 91.10 96.30 5.20 MEDIAN Rigid Pavement Repair (FRC) — 36% cracking · 18mm rut · IRI 5.9 RM 22,360,000 Belati Wangsa Sdn Bhd P
3 BP07 Hulu Selangor Kajang – Seremban FT0001 102.70 104.30 1.60 L&R Rigid Pavement Repair (FRC) — 36% cracking · 18mm rut · IRI 5.9 RM 6,880,000 Belati Wangsa Sdn Bhd P
4 BP07 Sepang Shah Alam – Kuala Lumpur FT0002 43.20 44.80 1.60 L Rigid Pavement Repair (FRC) — PCI 73 RM 10,320,000 Belati Wangsa Sdn Bhd P
5 BP07 Sepang Shah Alam – Kuala Lumpur FT0002 53.20 57.60 4.40 MEDIAN Rigid Pavement Repair (FRC) — PCI 73 RM 28,380,000 Selia Selenggara Sdn Bhd P
6 BP07 Sepang Shah Alam – Kuala Lumpur FT0002 63.20 66.70 3.50 MEDIAN Rigid Pavement Repair (FRC) — PCI 73 RM 22,575,000 Teras Teknologi Sdn Bhd P
JUMLAH 17.90 RM 97,395,000
Disediakan oleh (KBJ / JKR Negeri):
Ir. Norhaslinda binti Abdul Rahim
Tarikh: —
Dihantar kepada (HQ):
Tarikh: —